BJWSA
Growth in Southern Beaufort County and Jasper County requires increased capacity from 15 MGD to 30 MGD with consideration for ultimate capacity of 45 MGD as total system demand reaches +/- 26.5 MGD. Project identified in 2017 Master Plan. Expand Purrysburg WTP to 30 MGD including plate settler/filter media pilot study; addition of 2 12-MGD pumps in river pumping station; addition of 2 12-MGD pumps with VFD's in reservoir pumping station; addition of new flow control/rapid mixing structure; addition of new flocculation/plate settler basins; addition of new filters at same number and size as existing; add 2 12-MGD pumps in transfer pumping station; add second clearwell for capacity/redundancy; replacement of 2 existing 5.5 MGD pumps; and construction of residuals handling based on outcome of study. Conducted BJWSA final walk thru with Reeves Young, GMC, Plant Operations & Tech Maintenance. Created an updated list of punch list items for Reeves Young.
Project snapshot
BJWSA service area
Official source unavailable
The stored source link has not completed identity, final-URL, redirect, and citation review, so Civic Brief does not label it as authoritative.
Civic Brief provides an unofficial explanation. Official source material remains authoritative.
Next expected action
Watch BJWSA Capital Projects Dashboard for construction schedule changes, project notices, budget or scope updates.
Why it matters
BJWSA capital projects can affect water and sewer capacity, utility reliability, construction activity, budgets, service availability, and long-term growth planning. Civic Brief stages these records for admin review before they are used for resident alerts.
Project overview
Location
Status / phase
Budget / schedule
Follow or report
Team / contacts
Latest update
Source lineage